Episode 3 – It is moving

Final assembly consisted of screwing the six legs to the main body, wiring up and loading the control software onto the Hexapod.

Final assembly
Final assembly
Loading the control software
Loading the control software
Impressive thing
Impressive thing

Then we had to run the test program to check the servomotors in the legs.

So far the first 3 episodes of our PhantomX AX Metal Hexapod Mark III Kit spider-on-the-web project.

The next episode will be published as soon as we have more news about this project.